CSX Jericho Bridge, Bethlehem, New York

Csx3

Project Location: Bethlehem, New York

Project Highlights: 

  • General contractor for demolition of the Jericho Road Bridge.
  • The bridge was a 12-span steel bridge that was 1,132 feet long.
  • Bridge spanned across 39 active railroad tracks and a diesel fueling station.
  • Track was only available for approximately 30 minutes at a time.
  • Salvaged 1,100 gross tons of steel.
  • Excavation and removal of 40,000 CY of material.
We have the experience to solve your bridge demolition challenges.