Clark Street Bridge, Arlington, Virginia

Clark St 1

Project Location: Arlington, Virginia

Project Highlights: 

  • Efficient demolition of segments of the Clark Street overpass in Arlington, VA.
  • The overpass spanned 15th Street & 18th Street in a confined urban environment.
  • Challenges faced, including the removal of 95-foot curved beams on 15th Street and proximity to the DC Metro on 18th Street.
  • Close collaboration with D.C. Metro, involving the implementation of vibration and exhaust monitoring due to the nearby metro stop.
  • On-site equipment fleet included two Komatsu excavators, a 40-foot boom lift, and a 165-ton crane.