Pearl Harbor Memorial Bridge, New Haven, Connecticut

Pier hammering at Q Bridge
Underwater concrete removal
Excavation of pier
Concrete hammering
two excavators removing concrete
High reach excavators
excavator removing concrete

Project Location: New Haven, Connecticut

Project Highlights: 

  • Demolished the Pearl Harbor Memorial Bridge.
  • Removed 170,000 square feet of concrete decking.
  • Demolished and removed 10,000 cubic yards of concrete substructure, half of which was located underwater to depths of over 30 feet.
  • Work was performed from both trestles and barges.

 